re: Ann: Drilling Success continues at Snake ... I contacted the company last week regarding the process of getting the Vertical Wells for Snake River into production.
Spud to drilling takes 8 to 10 days, then once fraccing is done they close them in for 21 days for pressure to build up before reporting 30 day IPs.
It appears given the current wells in progress, they should get 2 wells drilled, 2 fracced and 2 into production each month as they have previously advised.
Gonna be steady flow information, as 4 Horizontal RRC wells to follow sometime as well.
- Forums
- ASX - By Stock
- AOK
- Ann: Drilling Success continues at Snake River
Ann: Drilling Success continues at Snake River , page-5
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AOK (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.833M |
Open | High | Low | Value | Volume |
0.3¢ | 0.3¢ | 0.3¢ | $49 | 16.35K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
9 | 20333665 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.3¢ | 11137932 | 7 |
Last trade - 11.51am 18/11/2024 (20 minute delay) ? |
Featured News
AOK (ASX) Chart |
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Will Souter, CFO
Will Souter
CFO
SPONSORED BY The Market Online