KEY 0.00% 0.1¢ key petroleum limited

oil across 43m so far, page-46

  1. 916 Posts.
    An extract from a Company ann when Empire Oil and Gas had EP438 back in 2010. Thought it was intresting and a little more detailed. Currently drilling 160 mtrs away.

    'Hedonia-1 is located on an anticlinal feature and is of significant interest where well developed karstic porosity was intersected in
    Ordovician aged Willara limestones at a relatively shallow depth of some 1050 metres. The Hedonia-1 well lost circulation of its
    drilling fluids upon drilling into the top of this reservoir objective Willara Formation. This severe lost circulation indicates high
    permeabilities in this limestone reservoir where a significant gas show was recorded. This is an exciting reservoir objective where
    this formation was never properly tested. The testing programme on Hedonia-1 was terminated prematurely due to weather.
    There were also numerous oil and gas shows in the marine black shales of the Goldwyer Formation which demonstrates oil maturity
    in these source rocks.
    Drilling a new well on the Hedonia Structure is under consideration by the joint venture. The potential of this Broome Arch area is the
    prospectivity for both mid to large size oil and gas discoveries. Other wells with significant shows include Goldwyer-1 with oil shows
    in the Willara Limestone, and Willara-1 with oil and gas shows in the Permian Grant Formation.
    The EP 438 Permit and these prospects are located close to the Great Northern Highway allowing easy access and allow for
    extending the exploration season closer to the “wet” season. In addition, EP 438 is located comparatively close to port facilities,
    providing for the cost effective transport of oil and access to gas pipeline infrastructure, should hydrocarbons be discovered.
    Buru, to date, have completed an aeromagnetic survey, the West La Grange Aeromagnetic Survey, and are to complete the
    reprocessing of seismic for its registered 5% interest in EP 438. Depending on the well drilled under the Farmin Agreement, the sum
    of $3 million may include any completion and testing of the well. If the Hedonia Structure is drilled, Empire estimates the potential
    recoverable oil reserves, if hydrocarbons are present and the structure is filled to its mapped spill point, to be 5 million barrels of oil.'

    http://newsstore.theage.com.au/apps/previewDocument.ac?docID=GCA01029395EGO&f=pdf
 
watchlist Created with Sketch. Add KEY (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.