Rob
Yes, Weather can be issue but as They are drilling in Onshore, so I believe Weather won't be issue. SJB:03 Flow Rate (without Frac Stim.) was achieved in one week time, it was mid of Dec.
- Forums
- ASX - By Stock
- LRL
- sino gas flow test v lrl flow test
sino gas flow test v lrl flow test , page-3
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)