Spot on FRB. I was just reading NWE announcement for arrowsmith this morning. They should have equipment on site mid June. I still think this Perth Basin has been under estimated, especially the large land holding KEY have in close proximity with NWE. Punters have placed very little value if any at all on KEY average in The Perth Basin. I will be watching NWE arrowsmith project with great anticipation. Exciting few months ahead IMO
77
- Forums
- ASX - By Stock
- KEY
- nse start nicolay1 mid july
nse start nicolay1 mid july, page-3
-
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KEY (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.262M |
Open | High | Low | Value | Volume |
0.1¢ | 0.1¢ | 0.1¢ | $11 | 11K |
Featured News
KEY (ASX) Chart |
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Will Souter, CFO
Will Souter
CFO
SPONSORED BY The Market Online